Editorial
Email Article |
||
|
Paying more and getting less
The Washington DC Examiner Newspaper, The Examiner Jun 20, 2007 3:00 AM (908 days ago)WASHINGTON How’s this for a deal? Riding the $5.14 billion Dulles Rail extension will take twice as long as taking a $300 million Bus Rapid Transit vehicle (BRT) to the same place. That’s right, a 25-minute express bus trip from the Pentagon to Reston would take 57 minutes on the proposed Metrorail extension and cost much more per trip for a lower level of service, according to international transportation economist Gabriel Roth.
http://www.examiner.com/a-789649~Paying_more_and_getting_les s.html The above excerpt and link will be sent by email. |
||
|
|
||